UN 38.3 Testing for Prototype Battery Cells: Checklist
You can ship prototype lithium cells before they pass UN 38.3, but only under stricter rules. Those rules add paperwork and, for air freight, a government approval that can take months. UN 38.3 testing for prototype battery cells pays off once your design is stable and you will ship it more than a few times.
This checklist is for R&D teams that need to move cells to a test lab, a partner or a customer. It helps you choose a route, freeze the right design inputs and prepare the documents before samples leave the lab. If you want the cells tested rather than shipped untested, see our UN 38.3 and abuse testing for new cells.
|
Quick answer
|
Should you test now or ship as a prototype?
Test now if the design is frozen and you will ship it repeatedly. Ship as a prototype if the cells are going to a lab for testing and the design will still change. The US rules sit in 49 CFR 173.185(e), and PHMSA confirms in its 2024 interpretation of 49 CFR 173.185(e) that "prototype" and "low production" are two separate routes.
|
Route |
Fits when |
Key limit |
Air freight |
|---|---|---|---|
|
Tested design (passed UN 38.3) |
Design is frozen; regular shipments or deliveries to customers |
Test report and test summary must match the exact design |
Standard lithium battery rules apply |
|
Prototype for testing |
Early cells sent to a test lab while the design still changes |
Must be shipped for testing; no annual cap on prototypes for testing |
Needs approval from the country of origin; can take months |
|
Low production run |
Small pilot builds that are not shipped for testing |
Max. 100 cells or batteries produced per year (production, not shipments) |
Needs approval from the country of origin |
Outside the US, ADR and the IMDG Code cover untested prototypes under special provision 310. IATA air rules use special provision A88, which needs an exemption from the national authority every time.
Pre-test checklist for UN 38.3 testing of prototype battery cells
Freeze the design before you build UN 38.3 samples. Each design type needs its own test report, and the test summary must match the exact product you ship.
What to freeze before testing
|
# |
Freeze before you build samples |
|---|---|
|
1 |
Cell chemistry, active materials and electrode loading |
|
2 |
Cell format and dimensions (pouch, prismatic, coin or cylindrical) |
|
3 |
Rated capacity and nominal voltage |
|
4 |
Separator, electrolyte and casing or pouch material |
|
5 |
Tab design and any built-in protection |
How many cells to build
Ask your test lab for the sample count per test before you start the build. Then make the UN 38.3 samples in the same run as your R&D cells, so the tested cells match what you ship. Build a few spares so one damaged sample does not force a second build.
- Confirm sample counts per test with the lab in writing.
- Build test samples and R&D cells in one run, from the same material lots.
- Label every sample with build date and lot.
- Agree confidentiality terms before cells leave the lab (see protecting your IP when outsourcing tests).
What do the eight UN 38.3 tests check?
UN 38.3 runs eight tests that simulate transport conditions such as low pressure, temperature swings, vibration, shock and crush. Each test is named after the stress it applies.
|
Test |
Name |
What it covers |
|---|---|---|
|
T.1 |
Altitude simulation |
Low air pressure, as in an aircraft hold |
|
T.2 |
Thermal test |
Rapid swings between high and low temperatures |
|
T.3 |
Vibration |
Vibration during road, rail, sea or air transport |
|
T.4 |
Shock |
Shocks from handling and drops in transit |
|
T.5 |
External short circuit |
A short across the cell terminals |
|
T.6 |
Impact / crush |
Impact for cylindrical cells of 18 mm diameter or more; crush for prismatic, pouch, coin/button and cylindrical cells under 18 mm |
|
T.7 |
Overcharge |
Charging beyond the rated limit |
|
T.8 |
Forced discharge |
A cell forced into discharge by others in a pack |
UN 38.3 covers transport only. It does not replace performance or wider safety work; see what a battery safety test programme involves.
Which documents do you need before the first shipment?
You need a UN 38.3 test report, a test summary that matches the product, and trained shippers before a tested design moves.
- Test report: held by the manufacturer for each design type.
- Test summary (section 38.3.5): required in detailed form since 1 January 2020 and passed down to anyone who ships or sells the cells.
- Current edition: the 8th revised edition of the UN Manual of Tests and Criteria has applied since 27 November 2023. Ask the lab which edition it tests to.
- Shipper training: US shippers of lithium cells need training under 49 CFR Part 172, Subpart H.
Does a design change mean retesting?
A change can create a new design type, and a test summary only covers the design it names. If you change chemistry, format, capacity or construction, ask your test lab whether the existing report still applies before you ship on it. Do not assume an old summary covers a revised cell.
Shipping untested prototypes: what changes
Untested cells can move, but with more work. Ground shipments often need specialised packaging, dangerous-goods training and detailed documents. Air shipments need approval from the country of origin, and in the US a DOT approval, which can take months.
This checklist does not replace your carrier's or regulator's decision. For an air shipment or an approval, involve a dangerous-goods professional.
Frequently asked questions
Can prototype cells ship before they pass UN 38.3?
Yes. In the US, prototype cells transported for testing can ship under the exception in 49 CFR 173.185(e) without a UN 38.3 pass. PHMSA says there is no annual limit on prototypes shipped for testing. Stricter packaging, training and paperwork apply, and air shipments need prior approval.
How many cells count as a low production run?
A low production run is an annual production of not more than 100 lithium cells or batteries. PHMSA describes this as a production limit, not a limit on how many shipments you make. Low production is a separate route from prototypes shipped for testing, and each has its own conditions.
What is the difference between the test report and the test summary?
The test report is the full record of the UN 38.3 tests, kept by the manufacturer for each design type. The test summary is the shorter document defined in section 38.3.5. It must be handed to anyone downstream who ships or sells the cells, and it has to match the product.
Does the test summary stay valid if we change the design?
Only if the change does not create a new design type. The summary must match the specific product, and each design type needs its own report. If you change chemistry, format, capacity or construction, check with your test lab before shipping. Shipping on an outdated summary means shipping an untested design.
Can untested prototype cells go by air?
Only with approval. The shipper must get approval from the government of the country of origin, and for US shipments a DOT approval is required. These approvals can take months. Under IATA rules, special provision A88 needs a national-authority exemption every time, so plan air shipments early or test first.
|
Planning your first prototype shipment? Canrud builds and tests prototype cells for battery R&D teams. Tell us your cell format, chemistry and shipping plan and request a testing quote. We'll scope the samples and tests with you, with all costs listed upfront. |
منتجات وخدمات ذات صلة
استخدم منتجات Canrd وخدمات البحث والتطوير لتحويل معرفة البطاريات إلى تجارب عملية.
علبة coin cell
منتجعلب coin cell للتحقق من المواد والمفاهيم الكهروكيميائية المذكورة في المقالة.
استخدم علب coin cell في اختبارك التالي →إلكتروليت الصوديوم
فئةإلكتروليتات لأبحاث بطاريات الصوديوم-أيون واختبارات التوافق والتحقق من الخلايا.
تصفح إلكتروليت الصوديوم للتحقق →تصنيع الخلايا
خدمةاحصل على دعم لبناء خلايا جافة أو مجمعة أو صيغ مخصصة للتحقق في البحث والتطوير.
اطلب دعم تصنيع الخلايا →مواد تجريبية
فئةتصفح مواد للتجارب اللاحقة والمقارنة وتطوير المنتجات.
تصفح مواد البطاريات التجريبية →